TPG Road Work: Week Of November 7, 2022

HAMMOND—Rumble strips will be installed on Rufus Bankston, Wardline Road, and Sisters Road in the next several days.

Tangipahoa Parish President Robby Miller said the RPC contractor will be installing rumble strips on these heavily-traveled roads during the week of Nov. 7. Crews will continue to work on temporary striping of Sisters Road during the same period.

Also on the calendar this week are several Phase 22 parish wide projects, including:

  • Dressing: East Merry, Nicholas, Blaire Boulevard, Milan, Naples, Kayla, Penny, North and East Charbonnet, Bella Gardens, Blythwood, Wood, Crown, Sandy Crews, Wadesboro, and Coates;
  • Patching: Wilson and LA Polo Farms Road; and
  • Paving: LA Polo Farms Road, and Audubon.

All work is weather-permitting. Any related closures will be posted on the day of construction.